      Yard tractors, also called terminal tractors or shunters, move trailers and containers around ports, rail terminals and distribution centres all day. As operators switch to electric models, charging has to fit around tight shift patterns in yards where every metre of space is working space. MPMC’s BCH Series mobile BESS chargers bring fast DC charging into the yard without permanent installation, and can be repositioned as yard layouts change.

      Why Mobile Charging Suits Yard Operations

      Charging in Short Windows

      Electric yard tractors are often topped up during breaks and shift changes. The BCH-600-400, BCH-800-600 and BCH-500-1000 deliver 400 kW to 600 kW through two 350 A CCS2 guns with 6 m cables, charging two tractors at once, and the BCH-800-600’s 1C charge and discharge suits rapid turnaround.

      Because each unit stores energy between sessions, it can deliver this power from a modest yard supply: the BCH-800-600 draws 280 kW while charging at up to 600 kW, so tractors are topped up quickly without straining the terminal’s connection.

      Flexible Positions in a Busy Yard

      Mobile units can sit at the edge of trailer parking, near the workshop or beside the gatehouse, and move when the yard is reorganised. The BCH-275-200 rides on a 3.5-tonne trailer with forklift pockets, and the larger heavy-duty units can be relocated across the yard or between terminals as needs change.

      Each unit is self-contained, so installation needs no trenching or new switchgear, and the yard can keep operating while charging equipment is positioned and commissioned.

      MPMC BCH-500-1000 mobile BESS charger fast-charging a truck through its CCS2 charging gun.

      Table 1. BCH models for electric yard tractor fleets

      Model

      DC charging

      Storage

      Grid draw

      Yard role

      BCH-275-200

      150 kW (2 x 250 A)

      203.5 kWh

      80 kW

      Smaller yards; easy repositioning

      BCH-600-400

      400 kW (2 x 350 A)

      407 kWh

      280 kW

      Shift-change top-ups for several tractors

      BCH-800-600

      600 kW (2 x 350 A)

      610.6 kWh

      280 kW

      Rapid turnaround; 1C performance

      BCH-500-1000

      500 kW (2 x 350 A)

      1,075 kWh

      560 kW

      Large terminals; round-the-clock operation

      Note: The table shows selected models; the BCH Series also includes the BCH-80-70 and BCH-60-70.

      Proven at a UK Logistics Port

      At a UK logistics port, electric trucks serving four-hour port routes previously needed 10-hour charging cycles because of the local grid connection. Eight MPMC BCH-275-200 units, combined with solar, lifted charging capacity beyond the grid connection and moved the operation to near-continuous charging. In the Netherlands, a BCH-275-200 and BCH-500-1000 combination charges vehicles from renewable energy at a port and logistics site.

      For terminals introducing electric tractors in stages, this approach lets charging capacity grow unit by unit alongside the fleet, without waiting for grid works to complete before the first tractors go into service.

      MPMC BCH-600-400 mobile BESS charger with dual CCS2 guns for heavy vehicle charging.

      More Than a Charger in the Yard

      BCH units also power the yard. AC output of 200 kW on the BCH-600-400 and BCH-800-600 and 500 kW on the BCH-500-1000 runs workshop tools, lighting and gate systems, with UPS-grade output on the two largest models. Every model runs an EMS with 4G and OCPP 1.6 so charging data flows into the terminal’s operating systems, and units reach full operation within 24 hours of arrival.

      Table 2. Yard operation needs and BCH features

      Yard need

      BCH feature

      Benefit

      Short charging windows

      400-600 kW; dual 350 A guns

      Tractors back in service quickly

      Modest grid capacity

      Battery buffering; 280-560 kW input

      High power without grid upgrade

      Changing layouts

      Mobile, heavy-duty and trailer formats

      Charging moves with the yard plan

      Yard power

      AC output up to 500 kW; UPS-grade on large models

      Workshop and gate systems supported

      System integration

      4G EMS, OCPP 1.6, open API

      Data in terminal management systems

      Blade LFP batteries rated for 6,000 cycles at 90% depth of discharge and liquid-cooled packs on the larger models are built for the daily cycling of yard work. BCH-275-200 and larger models carry a 3-year system warranty and a 5-year battery performance warranty.

      C4 anti-corrosion coating is standard, with C5 available on the BCH-800-600 and BCH-500-1000 for coastal ports, and CE-certified aerosol fire protection is built in. MPMC supports each terminal with design consultation, commissioning by MPMC engineers and remote diagnostics through its SCADA/EMS cloud platform.

      Planning Yard Tractor Charging With MPMC

      • Count electric yard tractors and their daily energy use

      • Map shift patterns and charging windows

      • Identify yard positions and available supply

      • Connect units to terminal systems via OCPP 1.6

      • Contact MPMC at sales@mpmc-china.com or WhatsApp +86 150 0085 4420 for a yard charging plan

      https://www.mpmc-group.com/
      MPMC Powertech Corp.

    Viewing 1 post (of 1 total)
    • You must be logged in to reply to this topic.

    TRENDING